Doha Petroleum Construction Co. Interview Questions

Updated Mar 31, 2015
1 Interview Review

Interview Experience

Interview Experience

100%
0%
0%

Getting an Interview

Getting an Interview

100%

Interview Difficulty

2.0
Average

Interview Difficulty

Hard

Average

Easy

Interviews for Top Jobs at Doha Petroleum Construction Co.

More

Candidate Interview Review

Sort: Popular Date Difficulty
  1.  

    Senior Engineer (Electrical/Instrumentation) Interview

    Anonymous Employee in Dubai (United Arab Emirates)
    No Offer
    Positive Experience
    Easy Interview

    Application

    I applied online. The process took 2 weeks. I interviewed at Doha Petroleum Construction Co. (Dubai (United Arab Emirates)) in November 2011.

    Interview

     Verification of FEED (Front End Engineering Design) documents in order to deliver the detailed engineering, design and procurement for the aforementioned project as per the project specifications, International Codes and Standards.  Participation in Kick off Meetings, Design Review Meetings and Vendor Review Meetings.  Participation in HAZID (Hazard Identification Studies) with the Client.  Attending Meetings with Control System / Automation Vendors for clearing all technical queries.  Review of Cable Block Diagrams, Cable Schedules and Interconnection Diagrams.  Review of Junction Box and Cable Routing (above ground and underground) Layouts.  Review of Instrument Loop Drawings for DCS / ESD / F&G and Third Party Systems.  Review of Fire & Gas Zones and Detector Layouts for the Plant.

    Interview Questions

    •  Involved in Procurement of all Long Lead Instrumentation Items viz... FFDCS, ESD and F&G Systems, FF Spur and Trunk Cables with Junction Boxes, ESD and F&G Cables as per Material Requisitions and TBE.  Preparation of necessary Method Statements such as Installations in existing facilities, Tie-Ins etc...  Supervision of all relevant Cable Tray Installations and Laying of Cables in Cable Tray / Trench in accordance with approved Design documents from client.  Loop Checking of all relevant FF Instruments like PT, TT and FT before commencement of shutdown.  Supervision in Installation of Emerson FF DCS System as well as I/O Cabinets in the existing Control Rooms.  Identification and Tagging of all the Home Run Cables entering in the existing DCS / ESD and F&G Cabinets.  Supervision and solely responsible for the removal of all existing Conventional DCS / ESD / F&G / Third Party Cabinets and re-instatement of all new cabinets in the same location along with Glanding and Termination of existing Home Run Cables in the new ones.  Powering ON of the new DCS / ESD / F&G / Third Party and Network Cabinets.   1 Answer
Don't Miss Out On a Job You Love
Upload a resume to easily apply to jobs from anywhere. It's simple to set up.

The difficulty rating is the average interview difficulty rating across all interview candidates.

The interview experience is the percentage of all interview candidates that said their interview experience was positive, neutral, or negative.

Your response will be removed from the review – this cannot be undone.