Senior Software Engineer applicants have rated the interview process at HCLTech with 2.9 out of 5 (where 5 is the highest level of difficulty) and assessed their interview experience as 61% positive. To compare, the company-average is 60.6% positive. This is according to Glassdoor user ratings.
Candidates applying for Senior Software Engineer roles take an average of 14 days to get hired, when considering 76 user submitted interviews for this role. To compare, the hiring process at HCLTech overall takes an average of 17 days.
Common stages of the interview process at HCLTech as a Senior Software Engineer according to 76 Glassdoor interviews include:
One on one interview: 25%
Skills test: 16%
Phone interview: 13%
Background check: 11%
Group panel interview: 9%
Presentation: 9%
Personality test: 6%
Drug test: 5%
Other: 3%
IQ intelligence test: 1%
Here are the most commonly searched roles for interview reports -
I applied online. I interviewed at HCLTech (Hyderābād) in Nov 2021
Interview
There are 2 rounds of technical interview and got selected in both. After that received an email regarding Documents submission and i have submitted the required documents.
That's it after that no response from them and final they said package is constrain.
Interview questions [1]
Question 1
1. Explain Solid principles
2. Authentication mechanism in MVC
3. Filters in MVC
4. State management in MVC
the interview process is good. First round was face to face round and all othethe interview process is good. First round was face to face round and all others are virtual rounds. Communication with HR is good.rs are virtual rounds.
The interview process is quite confusing and unstructured. It starts with two technical rounds, followed by an HR round. However, even after the HR discussion, there is an additional manager round that is highly technical. The manager round is particularly frustrating, as it is initially presented as a 15-minute call but ends up lasting around 45 minutes, with questions asked in a rushed manner. Additionally, the feedback timeline is very slow, with about 10 days between each round. Because of these delays and the unclear process
Technical Round 1: Java fundamentals, Map concepts, and basic Spring Boot questions.
Technical Round 2: Java coding problems and problem-solving discussion.
HR Round: Behavioral questions, communication evaluation, and discussion about experience, expectations, and company culture fit.
Interview questions [1]
Question 1
Technical Round 1: Java fundamentals, Map concepts, and basic Spring Boot questions.
Technical Round 2: Java coding problems and problem-solving discussion.
HR Round: Behavioral questions, communication evaluation, and discussion about experience, expectations, and company culture fit.