Sterling Engineering u0026 Design Group interviews FAQs
Candidates applying for Assistant PM roles take an average of 14 days to get hired, when considering 1 user submitted interviews for this role. To compare, the hiring process at Sterling Engineering u0026 Design Group overall takes an average of 14 days.
Common stages of the interview process at Sterling Engineering u0026 Design Group as a Assistant PM according to 1 Glassdoor interviews include:
I applied through an employee referral. The process took 2 weeks. I interviewed at Sterling Engineering u0026 Design Group in Aug 2010
Interview
I had two interviews, the last one was with the VP. The questions were somewhat hard but overall fair for the position. The VP treated me with respect and told me to wait at least a week to make an offer. Within three days of the interview I was sent an offer letter with a very disappointing salary.
Interview questions [1]
Question 1
An unexpected question I had at the end of the interview was if I would like to pursue an engineering degree?