Senior Document controller - Document Controller Archirodon Employee Review

3.0
Nov 25, 2024
Recommend
CEO approval
Business Outlook

Pros

Good Projects: Involvement in significant infrastructure projects, offering exposure to large-scale operations. Stability: The company is known for its strong presence and reliability in the industry, ensuring job security.

Cons

Limited Career Growth: Employees may face stagnation with minimal opportunities for development or advancement over the years. Perceived Favoritism: Clear preferences based on nationality or regional affiliations (Arabs, Greeks, Indians, especially Malayalis). Lack of Support: Success heavily depends on top management's involvement, and independent growth may be challenging without their backing.

Explore other reviews about Archirodon

4.0
Apr 4, 2021
Recommend
CEO approval
Business Outlook

Pros

Good salary comparing to the market High level of stability

Cons

No KPIs Promotion based on number of spent years not on progress achieved

1
5.0
Apr 7, 2026
Recommend
CEO approval
Business Outlook

Pros

• Mechanical Engineer having 36 Years of Experience in fields of Executing to Tender. Bidding, Engineering, Procurement, Construction,Workover Engineering, hook up, hydro test. Commission of Cross country (Oil & Gas) pipelines, Flow lines, Refinery & Petrochemicals Expansion, Chemical process Plant, Rig Plot, Xmas-Tree. well head, Water well injection, Oil tanking terminal facility, MEP Project, Captive and Cogeneration power Plant. Processing and hydrocarbon handling facilities with exposure to long-distance pipeline and booster station systems. • International Projects of Oil &Gas processing, Water & Waste water Treatment, ITR control , Blast rates &specialized Building, Jacksers,top side, Anchor piles ,offshore Bridges, Skids,. package, modular solution, Automation control (PLC,SCADA,DCS), Remote control stations,SIS (F&G,ESD,SIS,HIPPS). • Budgeting, cost control, & variance analysis, Drive cost optimization & efficiency Variations,changeorders&claimsmanagement.QSPipelineprojects(MRICS/AIQS)Risk,Stakeholder,CommunicationManagementPlan,Review, monitor project baseline schedules, claims, variations • Pumps, Valves. Air compressor, HVAC works includs ducting, chilled water piping, and equipment installation. plumbing, drainage, water supply system installations..BIM, FM200System, NFPA14Fire Hydrant System • API 620 tank, API 650 Editions 12, 2013 , Cone Roof Tank, 60Meter,Dome Roof Tank, Internal Floating Roof, Floating roof tank,ASME SEC. 8, DIV1 ,Carbon Steel Storage Tank for JET A1 Fuel Storage. Crude oil, Gasoline , components

Cons

No Concern • Project Planning, Scheduling, Cost control, Man-hour control, Resource cost and utilization • Risk Analysis & Mitigation Plan, Root Cause analysis, identify and Execute the Corrective Action • Managing MRs, vendor offer reviews, TQs/ TBE, PO award, spares management • Ensure quality checks and Progress tracking of design activities performed in the 3D environment

See reviews by: Helpful|Rating|Date|All