The hiring process at Amp takes an average of 7 days when considering 3 user submitted interviews across all job titles. To compare, the average duration of hiring at similar companies like BlackRock, Inc. is 14 days, Fabricated Software, Inc. is 2 days, and Apple Inc. is 21 days. Candidates applying for AI Data Quality Control Tech had the quickest hiring process (on average 7 days), whereas AI Data Quality Control Tech roles had the slowest hiring process (on average 7 days).
I applied online. The process took 3 weeks. I interviewed at Amp (Port Credit, ON) in Jun 2024
Interview
I applied via LinkedIn and a Recruiter reached out. Then met with associate and direct manager. Then a 2 hour case study that I had to present to associate, direct manager and VP.
Interview questions [1]
Question 1
Prepare a wind farm financial model for a hypothetical development in Japan.
I applied online. The process took 1 week. I interviewed at Amp (Louisville, CO) in May 2025
Interview
Only made it through the initial phone screen interview with Luke Haberer. The experience was so negative I wanted to post about it here. I was very eager for this job and I had experience in the AI industry with the exact thing described in the job description. It was hard to hear him (sounds like he was far from the speaker in an echo-y room), and he cut our interview short, didn't even ask if I had questions. I have no idea what I did wrong, I was polite and interested in the job. Not surprisingly, I never heard back.
Interview questions [1]
Question 1
Ask me a lot of details about my previous job, which made me uncomfortable because I'm under NDA.
I applied online. The process took 4 weeks. I interviewed at Amp (New Delhi) in Oct 2022
Interview
very basic interview questions mainly related to road design, pvsyst, and green hydrogen. but it all depends whats mentioned in your resume or what kind of previous expereince do you have